If a work trip is still unconfirmed, mark its possible dates in your diary and write down which training windows would disappear. Keep a clear distinction between that possibility and a change you have actually saved to your running plan. Once the trip is confirmed, a dated adjustment in MOTRA Pro on iPhone can make those days full rest or reduced-volume training.
The first useful result is a calendar you understand. It is not a promise that a busy trip will leave your training unaffected.
Make a small plan for either outcome
A possible conference does not need two competing training calendars. Keep a short note beside your normal diary:
- The possible departure and return dates, including travel.
- Which days would realistically have room for running.
- Whether you want the conference itself to be a break from training.
- When you expect the booking to be confirmed.
Packing running shoes does not create a free hour. Look at the actual conference timetable, travel and other commitments before counting on a hotel run. If you already work with a coach, bring them that information when discussing the affected week.
This note is something you keep yourself. MOTRA does not turn an uncertain booking into a tentative plan automatically.
When the trip is confirmed, save its dates
In MOTRA Pro on iPhone, open Coach → Plan → Manage Plan → Add Holiday. The screen is called Holiday adjustments; you can use the dated controls for a work trip too.
Choose the Start and End dates and an Adjustment:
- Full rest pauses planned training for those dates.
- Reduced volume keeps half-volume easy running and pauses strength. You can choose whether to keep mobility sessions.
Tap Save adjustment, then check that the period appears under Saved adjustments. Open your plan and inspect the affected dates, including both the start and end day. Look at the surrounding week as well. Other saved adjustments can affect what you see, and longer rest periods can also change the return weeks.
Treat this as a dated change within the plan. Check the resulting sessions rather than assuming that every later workout has moved back by the length of your trip.
A three-day conference example
Illustrative diary, not a training recommendation: your conference is pencilled in for 7–9 December. You decide you would prefer those three days free of planned training.
While the booking is uncertain, keep that decision in your diary note. Once it is confirmed, enter 7 December as Start, 9 December as End and choose Full rest. Save, then inspect all three dates in your plan. Include extra travel days only if they also belong in the adjustment.
If the conference is cancelled before you leave, return to Holiday adjustments. Select the saved period to change its dates or mode, or choose Remove for that entry. Then reopen the plan and check the current and upcoming sessions. Removing one holiday adjustment does not clear other saved recovery adjustments.
If work has changed your usual availability for the foreseeable future, use the separate regular running-days guide. That is a different calendar decision from a few conference days.
If this is the kind of running structure you need, get MOTRA and explore Pro's plan controls. Keep the possible trip in your diary, save the change when you know what you want, and check the calendar that results.